Avida Towers
Cebu City
Avida Towers Cebu is a place where everything feels secure, including your future. Located in Asiatown IT Park, it is now possible to live in an exciting, fast-paced city without the stress and the rush.
This residential property bears all the hallmarks of a sound investment. With superior property management and unparalleled security, this home is more than a roof over your head. It’s the future built for you. Experience life according to Avida.
Construction Update Images
Click here for more images of Avida Towers Cebu construction updates.
- Project land area is at 6,262 sqm.
- Avida Towers Cebu is located in Asiatown I.T. Park Ph.2 – Cebu City
- Very accessible to public transport and in close proximity to the Cebu Business Park (Cebu’s CBD)
- Master Site Development Plan
- Technical Details and Unit Descriptions
- Line of Sight per Tower
- Facilities and Amenities
- The main entrance for both vehicles and pedestrians is located along Inez Villa St.
- Amenities are located on the 1st residential level.
- Complaint Provisions for water supply, drainage, and electrical power supply
- Perimeter fence
- Three parking levels (Ground Floor and the two (2) Podium Parking Floors)
- Main lobby for each building
- Three (3) Elevator Units
- Emergency Power
- Fire Protection/Fire Alarm System
- Mailbox per unit located at the lobby
- Function Hall/Clubhouse located in Tower 1 (Podium Level)
- Swimming Pool
- Children’s play area
- Landscaped area
- Outdoor Gym
- Jogging Path
- Centralized Cistern
- Wi-Fi ready (amenity area only)
- Unit Deliverables
- Units are telephone, cable and internet ready
- All units are equipped with smoke detectors
- Units-Vinyl Planks
- Toilet and Bath – Ceramic Tiles
- Utility Area (for 1 BR and 2 BR units) – Ceramic Tiles
- Aluminum Windows
- Unit Partitions – CHB Walls (painted)
- Interior Partitions – Gypsum Board (painted)
- Toilet and Bath – Ceramic Tiles and CHB (painted)
- Utility Area – CHB Walls (painted)
- Kitchen sink base
- Complete Kitchen Fixtures
- Kitchen Countertop: HPL
- Overhead and Undersink cabinets
- Grease trap
- Complete Toilet and Bath Fixtures
- 2 T&B Units for 2 Bedroom Units
- For 1 Bedroom and 2 Bedroom Units Only
I. Property Description |
|
II. Project Details
Ground Floor |
will house retail area, main lobbies for each tower, retail parking and residential parking units. |
Podium |
will house residential parking units (2nd-3rd Floor) |
Residential Floors |
will be located from 4th floor and above. Amenity level will be located on the 1st residential level |
Building Orientation: Both towers will be built in a linear manner in accordance to the lot configuration. This maximizes the available views for the project and it provides more spaces for our amenity area.
Total Land Area |
6,262 sqm |
Total No. of Buildings |
Two (2) towers |
Total No. of Residential Units |
1,045 units (T1: 518 Units/ T2: 527 Units |
Total No. of Parking Units |
401 units (T1: 201 Units/ T2: 200 Units |
Tower 1 |
|
Total Number of Residential Units |
518 |
Total Number of Residential Floors |
22 |
Units per Floor |
24 |
Unit Mix (see break-up below) |
|
Studio A (22.40) |
260 |
1 BR A (34.44) |
43 |
1 BR B (35.00) |
43 |
1 BR C (35.04) |
43 |
1 BR B (36.02) |
43 |
1 BR C (36.36) |
43 |
2 BR (52.50) |
43 |
|
|
Total Number of Parking Units |
201 units |
Total Saleable Area |
15,603.28 |
Presented views and frontage above are relative per floor level. Generally, units with prime views will be facing the east/morning sun for the upper floors and units facing the amenity area for lower floors. Nonetheless, all sides are currently unobstructed and residents should be able to enjoy clear view of the mountain range, IT Park and a glimpse of the sea.
Development Features |
|
Tower Features |
|
Community Facilities |
All amenities shall be located on the podium area to provide easy access for residents and to isolate it from the busy streets of AITP. |
Deliverable Units |
Standard Finish |
Flooring |
|
Windows |
|
Walls |
|
Kitchen |
|
Toilet and Bath |
|
Utility Area/Laundry Area |
|
III. Project Milestones
Project Launch |
June 2010 |
Tower 1 Completion |
June 2013 |
Tower 1 Turnover |
3rd Quarter of 2013 |
Tower 2 Launch |
*subject to Tower 1 Take-Up |
Tower 2 Completion and Turnover |
*subject to Tower 2 Launch |
Amenity Completion |
4th Quarter of 2013 |
- Please contact us for more information, inquies, computations, floor plans, availabilty of units and reservation. Thank you